REEP House Photos

20 Mill Street in winter

20 Mill Street in the winter

Preparing for the permeable paving driveway and parking lot

The permeable pavers being laid out

More permeable paving stones

Scraping paint from the porch

Original door handle

View of the new Power Pipe from above

Reitzel Insulation ready to insulate walls

Attic with sprayfoam up the slopes

Attic with partial drywall

Subfloor in the basement with in-floor heating piping being laid down

Reitzel Heating and Cooling installing our heating system

The heat recovery ventilator

Open ceiling showing lighting hardware

Refinishing reclaimed wood for REEP House

Installation of the Power Pipe water heat recovery unit

New stained glass window in the stairwell